New year - new building luck: A lot has happened and although we did not quite manage to complete our construction as early as 2019, we have achieved quite a lot. Let's start with the parquet floor. All floors are finished and can only be walked on with velvet shoes from now on. In addition, all windows, doors and lights have been installed. With...
Mixwerk Blog
Intermediate result: For a long time there was no update from us but this has its reason. We have been busy with the studio expansion and have mastered most of the drywall construction. There were a few hurdles to overcome, a lot of wood was sawn and occasionally some injuries were accepted. Today we want to present you a little preview how far we ...
We continue with the third part of our dubbing studio build-blog in Berlin. Today we will give an overview of four essential organizational elements. These include: -Financing our own construction project-Fire protection considerations-Composition of the construction team from the architect, acoustician up to the parquet publisher-Technical equipme...
Welcome to the second part of our dubbing studio-building. Two weeks have passed and things are going on. But how exactly do we build our new studios? Well the option to quickly buy, saw and screw all the needed ourselves was out of the question for us. After all 400m² want to be used well and efficiently so planning and the room design went firs...